HC Bele 1 is situated on the 8th kilometre of Kukes-Shishtavec Road, Zapod, Kukes, Albania. The construction phase for HC Bele 1 took 24 month, starting from March 2011 until March 2013. Bele 1 SHPP has been in production since June 2013. The total certified  capital/construction costs of the project are € 5,400,000. Bele 1 SHPP has a total annual power generation estimate of 19,000,000 kwh.

HC Bele 1 Turbines main data
 Description Unit 1 Both
Unit 2
Nominal Power 2402 kw 2402 kw
Output Rate Voltage 6,000 v
Turbine Type Francis
Nominal Speed 750 rpm
Net Heat 85,42 m
Gross Head 90.10 m
Flow Rate 3,25 m3/s 3,25 m3/s
Runaway Speed 1.768 rpm
Axial Direction Horizontal
Wicket Gate Number 12
Runner Blade Number 13
Nr Parameters HSPP
 1 Gross head (m) 66.9
 2 Net head (m) 60.4
 3 Calculated/design water flow (m3/sec) 9.00
 4 Installed capacity (MW) 2×2.5
 5 Maximum Output (at generator terminal) (MW) 4.75
 6 Yearly average energy generated (KWh/Year) 18.369
 7 Investment (mio. Euro) 6.649
 8 Date of entering production June 2013